Select Page

Dog Leash Long PVC Leashes Durable Training Recall Long Lead 1.5M 3M 6M 9M Great for Training Beach Yard Play

Price range: $13.14 through $32.27

SKU: d50qcmgcuspg00ecdqm0 Category:

Description

describe

Material:PVC

Length:5FT/1.5M  10FT/3M 20FT/6M  30FT/9M

Applicable Breeds:Small Medium Large Dogs

Scenes:Dog Training Beach Yard Camping Swimming

Features:  doesn't get wet and smelly Odor-resistant, easy to clean, and never tangles

Color:Blue Red Green Black Orange

Advantage

1. The dog leash is made of the strongest climbing rope with PVC coating. 100% Eco-friendly. The dog leash is durable and can also hold 600 lbs of pulling force. Great for large, small, medium dogs.

2. Waterproof design: Based on the consideration of rainy days or beach walks, the belt is coated with PVC. It doesn't get wet and smelly. Odor-resistant, easy to clean, and never tangles

3. Lightweight and colorful, match all dog for your dog. Our dog leash length is 5 feet,10 feet,20feet,30feet. For dog walking or dog training.

4. Comfortable and secure, yet soft enough to not tear your hands while training, walking or running with pets. The 360°rotatable clasp is made of high-quality zinc alloy. The collar will not disengage without the trainer loosening it.

Additional information

Color

Black, Blue, Green, Red, Orange

Size

9m, 1.5m, 6m, 3m

Reviews

There are no reviews yet.

Be the first to review “Dog Leash Long PVC Leashes Durable Training Recall Long Lead 1.5M 3M 6M 9M Great for Training Beach Yard Play”

Your email address will not be published. Required fields are marked *